Get an instant, ZIP-code accurate post-construction cleaning estimate — enter a few details and see a real price range in under 60 seconds. Cleanup after renovation or new construction — dust, debris, and paint splatter removal, priced by square footage and scope.
Loading your free post-construction cleaning cost calculator… please enable JavaScript to use the interactive calculator.
What Affects Your Post-Construction Cleaning Price
Priced on the same sqft base as house cleaning, with a 2.18–2.35x multiplier for the extra dust, debris, and detail work
Scope matters: a moderate renovation (multiple rooms, a kitchen or bath remodel) costs 8–18% more than a light touch-up, and new construction or a major/gut renovation costs 15–30% more
Window cleaning ($60–$90) removes paint overspray and construction film from glass
Debris haul-away ($120–$200) and vent/duct dust removal ($45–$70) are common add-ons after a build
Post-Construction Cleaning Cost Calculator FAQs
How much does post-construction cleaning cost?
For a 1,500–2,000 sq ft home — the most common size — post-construction cleanup costs $344–$465. Smaller spaces under 1,000 sq ft run $200–$270, while homes over 3,000 sq ft run $593–$794.
What's the difference between light, moderate, and full post-construction cleanup?
Light covers a touch-up renovation or one or two rooms. Moderate covers a multi-room renovation like a kitchen or bath remodel, and costs 8–18% more. Full covers new construction or a major/gut renovation, and costs 15–30% more — both reflecting the greater volume of dust and debris.
Does post-construction cleaning remove paint splatter from windows?
The window cleaning add-on ($60–$90) specifically removes paint overspray and construction film/stickers from glass — a standard clean doesn't include this level of detail.
Will the cleaning crew haul away construction debris?
Only if you add debris haul-away ($120–$200) — a standard post-construction clean focuses on dust and surface cleanup, not removing leftover building materials.